Nederland Community Presbyterian Church

The Little Brown Church with a Bell

Bridge Construction

Drawing of bridge, as designed

Jon Hubert and his team at Singing Saw Woodworks are in charge of fabrication.

The foundation and stonework are being constructed by Sherpa Landscaping, with Lhakpa Sherpa.

The bridge design is by Paul Turnburke, Turnburke Associates.


 

Location and Contact Information
210 W Jefferson St.
PO Box 467
Nederland CO 80466
303 258 3579 message
Gary Ennor 303.258.1418
Frank Lutz  303.258.3849


Directions:
1 block north of the Nederland traffic circle on Highway 72.
Map

Location and Contact Information
210 W Jefferson St.
PO Box 467
Nederland CO 80466
303 258 3579 message
Gary Ennor 303.258.1418
Frank Lutz  303.258.3849


Directions:
1 block north of the Nederland traffic circle on Highway 72.
Map


At the north edge of our property, Beaver Creek separates us from our parking area. The footbridge will connect us.

More than that, the Bridge will be a joy to look at, to walk over, to draw our attention to the sparkling waters of the creek.

What was once a tangle of overgrown grasses and shrubbery now brings us pleasure, quiet and joy.

This project is a part of the development and construction of Guyer Garden.

|Day 1|Day 2|Day 3-5|Day 6|Day 8-9|Day 10-12|
|Installation|Here it is!|


Day 1
The raw materials: 6x12 cypress beams.

Raw 6x12 cypress beams



Squaring the beams.

Jon Hubert squaring the edges of the beams.



Measure twice, cut once.

Measuring, cutting



Laminating, now 6x24.


Laminating two beams

Next...Day 2


Progress