|
The Little Brown Church with a Bell
|
Bridge ConstructionDay 10, 11 and 12|Day 1|Day 2|Day 3-5|Day 6|Day 8-9|Day 10-12| |Installation|Here it is!|
| |
|
|
Gluing the laminate to the jig.
|
The glue-up! 50+ clamps and gallons of glue.
|
|
One railing completely fabricated.
|
Cutting a railing to width.
|
|
The railings now installed.
|
Ready to be moved to Nederland and installed.
|
|